<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Locally Grown Northfield &#187; Master Development District Fund</title>
	<atom:link href="http://locallygrownnorthfield.org/post/tag/master-development-district-fund/feed/" rel="self" type="application/rss+xml" />
	<link>http://locallygrownnorthfield.org</link>
	<description>The people, issues, and events of Northfield, MN</description>
	<lastBuildDate>Fri, 10 Feb 2012 01:21:22 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Riverside Trail Extension complete; dedication set for July 10</title>
		<link>http://locallygrownnorthfield.org/post/18138/</link>
		<comments>http://locallygrownnorthfield.org/post/18138/#comments</comments>
		<pubDate>Wed, 23 Jun 2010 15:50:31 +0000</pubDate>
		<dc:creator>Griff Wigley</dc:creator>
				<category><![CDATA[City]]></category>
		<category><![CDATA[Master Development District Fund]]></category>
		<category><![CDATA[Mill Towns Trail]]></category>
		<category><![CDATA[Peggy Prowe Pedestrian Bridge]]></category>
		<category><![CDATA[Riverside trail extension]]></category>
		<category><![CDATA[Sean Simonson]]></category>

		<guid isPermaLink="false">http://locallygrownnorthfield.org/post/18138/</guid>
		<description><![CDATA[<p> Paving and landscaping on the Riverside Trail Extension between 5th St. and Riverside Park was completed this week.</p> <p>Sean Simonson, City of Northfield’s Engineering Tech Coordinator, wrote in last week’s Friday Memo that the “trail dedication ceremony is scheduled for Saturday, July 10th.”</p> <p>The Riverside Trail Extension connects downtown with the Peggy Prowe <p>Continue reading <a href="http://locallygrownnorthfield.org/post/18138/">Riverside Trail Extension complete; dedication set for July 10</a></p>]]></description>
			<content:encoded><![CDATA[<p><a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9390.jpg"><img class="colorbox-18138"  style="border-right-width: 0px; display: inline; border-top-width: 0px; border-bottom-width: 0px; border-left-width: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9390_thumb.jpg" width="73" height="55" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9386.jpg"><img class="colorbox-18138"  style="border-right-width: 0px; display: inline; border-top-width: 0px; border-bottom-width: 0px; border-left-width: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9386_thumb.jpg" width="73" height="55" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9387.jpg"><img class="colorbox-18138"  style="border-right-width: 0px; display: inline; border-top-width: 0px; border-bottom-width: 0px; border-left-width: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9387_thumb.jpg" width="73" height="55" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9388.jpg"><img class="colorbox-18138"  style="border-right-width: 0px; display: inline; border-top-width: 0px; border-bottom-width: 0px; border-left-width: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9388_thumb.jpg" width="73" height="55" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9389.jpg"><img class="colorbox-18138"  style="border-right-width: 0px; display: inline; border-top-width: 0px; border-bottom-width: 0px; border-left-width: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/06/IMG_9389_thumb.jpg" width="73" height="55" /></a>     <br />Paving and landscaping on the Riverside Trail Extension between 5th St. and Riverside Park was completed this week.</p>
<p><a href="http://www.ci.northfield.mn.us/cityservices/engineering">Sean Simonson, City of Northfield’s Engineering Tech Coordinator</a>, wrote in <a href="http://www.ci.northfield.mn.us/assets/0/061810JW.pdf">last week’s Friday Memo</a> that the “trail dedication ceremony is scheduled for Saturday, July 10th.”</p>
<p>The Riverside Trail Extension connects downtown with the Peggy Prowe Pedestrian Bridge over the Cannon River at Hwy 3 and then on to the <a href="http://www.milltownstrail.org/">Mill Towns Trail</a>. </p>
<p>The $245,000 to construct the trail came from the City’s Master Development District Fund.</p>
<p><strong>Update 7/12</strong>: I’ve added these two photos taken on 6/27 that show the signs urging people to walk their bikes around the corner.</p>
<p><a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/07/IMG_9505.jpg"><img class="colorbox-18138"  style="border-bottom: 0px; border-left: 0px; display: inline; border-top: 0px; border-right: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/07/IMG_9505_thumb.jpg" width="56" height="75" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2010/07/IMG_9504.jpg"><img class="colorbox-18138"  style="border-bottom: 0px; border-left: 0px; display: inline; border-top: 0px; border-right: 0px" title="Riverside Trail Extension" border="0" alt="Riverside Trail Extension" src="http://locallygrownnorthfield.org/wp-content/uploads/2010/07/IMG_9504_thumb.jpg" width="105" height="75" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://locallygrownnorthfield.org/post/18138/feed/</wfw:commentRss>
		<slash:comments>4</slash:comments>
		</item>
		<item>
		<title>Tree removal happening soon on MTT connection through Riverside Park?</title>
		<link>http://locallygrownnorthfield.org/post/11979/</link>
		<comments>http://locallygrownnorthfield.org/post/11979/#comments</comments>
		<pubDate>Mon, 27 Jul 2009 14:43:28 +0000</pubDate>
		<dc:creator>Griff Wigley</dc:creator>
				<category><![CDATA[City]]></category>
		<category><![CDATA[Master Development District Fund]]></category>
		<category><![CDATA[Mill Towns Trail]]></category>
		<category><![CDATA[Riverside Park]]></category>
		<category><![CDATA[Riverside trail extension]]></category>

		<guid isPermaLink="false">http://locallygrownnorthfield.org/post/11979/</guid>
		<description><![CDATA[<p> &#160; &#160;&#160; The routing of the new trail ($245,000 from the City’s Master Development District Fund) from the Mill Towns Trail bridge through Riverside Park will evidently necessitate the removal of (some? all?) the trees along the river adjacent to the 5th St. bridge. Among the larger trees there are three Norway (red) <p>Continue reading <a href="http://locallygrownnorthfield.org/post/11979/">Tree removal happening soon on MTT connection through Riverside Park?</a></p>]]></description>
			<content:encoded><![CDATA[<p><a href="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_0039.jpg" rel="lightbox"><img class="colorbox-11979"  title="Trees at Riverside Park and 5th St. Bridge" style="border-top-width: 0px; display: inline; border-left-width: 0px; border-bottom-width: 0px; border-right-width: 0px" height="75" alt="Trees at Riverside Park and 5th St. Bridge" src="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_0039_thumb.jpg" width="169" border="0" /></a> <a href="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_00171.jpg" rel="lightbox"><img class="colorbox-11979"  title="Trees at Riverside Park and 5th St. Bridge" style="border-right: 0px; border-top: 0px; display: inline; border-left: 0px; border-bottom: 0px" height="75" alt="Trees at Riverside Park and 5th St. Bridge" src="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_0017_thumb1.jpg" width="100" border="0" /></a>&#160; <a href="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_00201.jpg" rel="lightbox"><img class="colorbox-11979"  title="Trees at Riverside Park and 5th St. Bridge" style="border-right: 0px; border-top: 0px; display: inline; border-left: 0px; border-bottom: 0px" height="75" alt="Trees at Riverside Park and 5th St. Bridge" src="http://locallygrownnorthfield.org/wp-content/uploads/2009/07/IMG_0020_thumb1.jpg" width="56" border="0" /></a>&#160;&#160; <br />The routing of the new trail ($245,000 from the City’s Master Development District Fund) from the Mill Towns Trail bridge through Riverside Park will evidently necessitate the removal of (some? all?) the trees along the river adjacent to the 5th St. bridge. Among the larger trees there are three Norway (red) pines, an ash, a Chinese elm, and a diseased American elm.   </p>
]]></content:encoded>
			<wfw:commentRss>http://locallygrownnorthfield.org/post/11979/feed/</wfw:commentRss>
		<slash:comments>7</slash:comments>
		</item>
	</channel>
</rss>

<!-- Dynamic page generated in 0.406 seconds. -->
<!-- Cached page generated by WP-Super-Cache on 2012-02-09 19:52:05 -->
<!-- Compression = gzip -->
